Nashville, TN – Drivers traveling through Montgomery County and the surrounding Middle Tennessee counties should prepare for lane closures, utility work, resurfacing, bridge repairs, and other construction activities from Sunday, October 25th, through Saturday, October 31st.
In Montgomery County, work includes sidewalk installation on SR-112, cross-drain installation on SR-48, and a continuous lane closure on SR-13.
In Davidson County, drivers can expect overnight work along I-24, I-40, I-440, I-65, and several state routes. Robertson County also has scheduled utility work and maintenance.
Motorists should allow extra travel time, watch for workers and changing traffic patterns, and use caution in work zones.
Montgomery County
SR-112 — Sidewalk Installation: Monday, October 26th, through Friday, October 30th, from 9:00am to 3:00pm, a single westbound lane on SR-112 near mile marker 11 at 1811 Madison Street will be affected by sidewalk installation.
SR-13 — 24-Hour Lane Closure: Sunday, October 25th, through Saturday, October 31st, a single lane in both the northbound and southbound directions of SR-13 between mile markers 25 and 26 will be subject to a 24-hour lane closure.
SR-48 — Cross-Drain Installation: Monday, October 26th, through Friday, October 30th, from 9:00am to 3:00pm, single-lane restrictions in the northbound and southbound directions of SR-48 near mile marker 12 will be in place for cross-drain installation.
Davidson County
I-24 — Wall Pack Lighting Installation at Mile Marker 48: Monday, October 26th, from 8:00pm to 5:00am the following morning, a single lane in the eastbound and westbound directions of I-24 at mile marker 48 will be affected by wall pack lighting installation.
I-24 — Wall Pack Lighting Installation at Mile Marker 50: Wednesday, October 28th, and Thursday, October 29th, from 8:00pm to 5:00am the following morning, a single lane in the northbound and southbound directions of I-24 at mile marker 50 will be affected by wall pack lighting installation.
I-24 — LED Wall Pack Conversion at Mile Marker 50.2: Wednesday, October 28th, from 8:00pm to 5:00am Thursday, a single northbound lane of I-24 at mile marker 50.2 will be affected by an LED wall pack conversion.
I-24 — LED Wall Pack Conversion at Mile Markers 52.2–52.3: Tuesday, October 27th, from 8:00pm to 5:00am Wednesday, a single lane in the eastbound and westbound directions of I-24 between mile markers 52.2 and 52.3 will be affected by an LED wall pack conversion.
I-24 — ITS Device Repairs: Monday, October 26th, from 8:00pm to 5:00am Tuesday, a single eastbound lane of I-24 between mile markers 53 and 55 will be affected by repairs to intelligent transportation system (ITS) devices.
I-24 — ITS Box Wiring Replacement: Monday, October 26th, from 8:00pm to 5:00am Tuesday, a single westbound lane of I-24 between mile markers 57 and 58 will be affected by ITS box wiring replacement.
I-40 — Punch List Work and Sign Removal: Sunday, October 25th, through Thursday, October 29th, from 8:00pm to 5:00am the following morning, multiple lanes in both the eastbound and westbound directions of I-40 between mile markers 208 and 210 will be affected by punch list work and sign removal.
I-440 — Ramp LED Wall Pack Conversion at Mile Marker 5: Wednesday, October 28th, from 8:00pm to 5:00am Thursday, work to convert ramp lighting to LED wall packs will affect the westbound entrance ramp at I-440 mile marker 5. Thursday, October 29th, during the same hours, the eastbound entrance ramp at that location will be affected.
I-65 — Ramp LED Wall Pack Conversion at Mile Marker 80: Monday, October 26th, from 8:00pm to 5:00am Tuesday, the southbound entrance ramp at I-65 mile marker 80 will be affected by an LED wall pack conversion. Tuesday, October 27th, during the same hours, work will affect the northbound entrance ramp.
I-65 — Hamilton Avenue Bridge Deck Work: Sunday, October 25th, through Thursday, October 29th, from 8:00pm to 5:00am the following morning, multiple lanes in both the northbound and southbound directions of I-65 at mile marker 81 will be affected by bridge deck work near Hamilton Avenue.
SR-1 — Overhead Wiring Replacement: Monday, October 26th, beginning at 6:00am, multiple lanes in both directions of SR-1 between mile markers 32 and 35 will be affected by overhead wiring replacement. The schedule does not specify an end time.
SR-11 — Nolensville Road Resurfacing: Sunday, October 25th, through Thursday, October 29th, from 8:00pm to 5:00am the following morning, multiple lanes in both the eastbound and westbound directions of SR-11 near mile marker 1 will be affected by Nolensville Road resurfacing.
SR-11 — Nolensville Road Paving: Monday, October 26th, from 9:00am to 3:00pm, a northbound lane of SR-11 between mile markers 10 and 11 will be affected by paving. Tuesday, October 27th, from 9:00am to 3:00pm, multiple lanes in both the northbound and southbound directions will be affected. Wednesday, October 28th, from 9:00am to 3:00pm, multiple southbound lanes will be affected.
SR-155 — Thompson Lane Resurfacing: Sunday, October 25th, through Friday, October 30th, from 8:00pm to 5:00am the following morning, multiple lanes in both the eastbound and westbound directions of SR-155 between mile markers 0 and 3 will be affected by Thompson Lane resurfacing.
SR-155 — Barrier Wall Repair: Tuesday, October 27th, and Wednesday, October 28th, from 8:00pm to 5:00am the following morning, the westbound entrance ramp on SR-155 near mile marker 17 will be affected by barrier wall repairs.
SR-155 — Ramp Restriping: Sunday, October 25th, from 8:00pm to 5:00am Monday, all ramps in the northbound and southbound directions of SR-155 near mile marker 27 will be affected by restriping.
SR-174 — Bridge Deck Work: Monday, October 26th, through Friday, October 30th, from 9:00am to 3:00pm, multiple lanes in both directions of SR-174 between mile markers 0 and 1 will be affected by bridge deck work. Work is scheduled for each weekday during this period.
SR-24 — Broadway Closure for Pedestrian Volume: Friday, October 30th, and Saturday, October 31st, from 8:00pm to 5:00am the following morning, multiple lanes of SR-24 near mile marker 12 on Broadway will be closed due to pedestrian volume.
Robertson County
SR-11 — Mailbox Relocation: Monday, October 26th, from 9:00am to 3:00pm, a single southbound lane of SR-11 near mile markers 2–3 will be affected by work to move mailboxes away from the curb.
SR-76 — Underground Boring: Monday, October 26th, through Friday, October 30th, from 9:00am to 3:00pm, work along the shoulders in both directions of SR-76 between mile markers 4 and 16 will take place for underground boring.
SR-76 — Aerial Cable Installation: Monday, October 26th; Tuesday, October 27th; Wednesday, October 28th; and Friday, October 30th, from 9:00am to 3:00pm, single-lane restrictions in both directions of SR-76 between mile markers 10 and 17 are scheduled for aerial cable installation. On Monday, the listed lane restriction is westbound; on Tuesday, Wednesday, and Friday, the restrictions are listed in both directions.
Drivers should remain alert, reduce speed in work zones, follow posted signs, and watch for workers and equipment. Schedules may change due to weather or other conditions. Allow extra time when traveling through construction areas and drive safely.

